Related Posts
Tógáil Acomhal Thonn Láin / Construction of Toonlane Junction
Tá Acomhal Thonn Láin suntasach i gcomhthéacs scéim fhoriomlán an N22BBM toisc go bhfuil sé ar cheann de thrí... read more
N22BBM: Nuashonrú maidir le Baint Carraige ag Gearradh 4 sa Tonn Láin/ Update on Rock Removal at Cut 4 in Toonlane
Earthworks commenced in Section 1.2 of the scheme, which stretches from the Toonlane compound to the Kilnamartyra Road, in... read more
Update on rock blasting at Kilnagurteen, Macroom on Tuesday 21st July 2020
The first rock blast of the project was successfully undertaken at Kilnagurteen on Tuesday 21st July 2020. The location... read more
N22BBM FÓGRA POIBLÍ / PUBLIC NOTICE
Forbairt Bóthair N22 Baile Bhuirne - Maigh ChromthaTá sé tábhachtach a bheith ar an eolas gur láithreán tógála beo is... read more
N22BBM FÓGRA POIBLÍ / PUBLIC NOTICE
Forbairt Bóthair N22 Baile Bhuirne – Maigh Chromtha – N22 Baile Bhuirne to Macroom Road Development.Oibreacha Bóthair nach mór... read more
Rock Removal by Blasting Notification
Works are proceeding on the project with significant progress being made in Ballyveerane and Kilnagurteen since the return to... read more
N22BBM Fógra Poiblí Ean 2021
Covid-19 Freagairt don PhaindéimAr an 08 Eanair 2021, d’fhógair an Rialtas bearta breise laistigh de Leibhéal5 den Teacht Aniar agus Téarnamh... read more
Nuachtlitir Uimh. 2 / Newsletter No. 2
Fáilte go dtí an tarna nuachtlitir de chuid Forbairt Bóthair N22 Baile Bhuirne - Maigh Chromtha.Welcome... read more
N22BBM Droichead Abhann na Biochaille ( Bohill River Bridge) , Baile Bhuirne Interview with our Spanish colleagues.
The longest bridge on the N22BBM scheme is the Droichead Abhann na Biochaille Bohill River Bridge (S03) at Cappagh... read more
N22BBM S24 Tar-dhroichead Chúil Liatháin / S24 Coolyhane Overbridge – Update
Droichead 3-réise is ea an S24 Tar-dhroichead Chúil Liatháin, a thógann L-7480 Bóthar Áitiúil Chúil Liatháin a thrasnaíonn thar... read more