Related Posts
N22BBM FÓGRA POIBLÍ / PUBLIC NOTICE
Forbairt Bóthair N22 Baile Bhuirne - Maigh ChromthaTá sé tábhachtach a bheith ar an eolas gur láithreán tógála beo is... read more
Temporary Diversion of Coolyhane Road Upper, Macroom, July 2020
The Contractor has recently constructed a temporary diversion of the Coolyhane Road Upper. This diversion is provided to keep... read more
N22BBM – Public Notice
Covid-19 Pandemic Response - Jan 2021On the 8th January 2021, the Government announced additional measures within Level 5 of Resilience... read more
N22BBM FÓGRA POIBLÍ / PUBLIC NOTICE
Forbairt Bóthair N22 Baile Bhuirne – Maigh Chromtha – N22 Baile Bhuirne to Macroom Road Development.Oscailt Seachbhóthair Mhaigh Chromtha... read more
Seo an scéal faoi chuairt Ted ar an láithreán ar an 1 Meitheamh, 2020.
The Story of Ted’s visit on 1st June 2021The Brothers of Charity Services in Cork provide residential and day service programmes... read more
N22BBM FÓGRA POIBLÍ / PUBLIC NOTICE
Forbairt Bóthair N22 Baile Bhuirne - Maigh Chromtha - N22 Baile Bhuirne to Macroom Road Development.Oibreacha bóthair ag... read more
Reopening of Coolyhane Road (Mill Road), Macroom on 10th July 2020
The Coolyhane Road was closed from the 25th May 2020 for seven weeks to facilitate the commencement of construction... read more
Abha na Láinne droichead bhíomaí/Laney River Bridge Beams
A significant milestone was recently achieved on the N22BBM project by the Main Contractor, Jons Civil Engineering/John Cradock JV... read more
Mór-dhoirteadh coincréite do Dhroichead Abhann na Biochaille S03 i mBaile Bhuirne / Large Concrete Pour for the Bohill River Bridge S03 at Ballyvourney
Another significant milestone was achieved on the project recently by Jons Civil Engineering/John Cradock JV (the CJV). The bridge... read more
Cuairt ar an suíomh ag grúpa ó Innealtóirí Éireann ar an 21 Meán Fómhair 2022/ Site Visit by Engineers Ireland 21st September 2022
Site Visit - GhaeilgeSite Visit - English read more